Monthly develop capacities | Sampling lead time | Ton / month | Capacity utilization | Tolernace | Max dimension | Min dimension |
2~4 sets | 4~6 weeks | 250ton/m | 90% | ±0.20mm(OD) ±0.15mm(ID) |
150*300mm(19mm thickness)-carbon steel | 1mm |
300ton/m | 90% | ±0.20mm(OD) ±0.15mm(ID) |
150*300mm(16mm thickness)-stainless steel | 1mm | ||
200,000pcs/m | 90% | ±0.20mm | Length 3m( 3mm thickness) | 1mm | ||
100,000pcs/m | 90% | ±0.10mm | Length1.5m(2mm thickness) | 1mm | ||
150ton/m | 80% | ±0.02mm(ID) | 150*300mm(3mm thickness)-SST/Carbon steel | 1mm |